Engineering · Product & value flow
Product & value flow
Cycle time, throughput and predictability — computed from Linear issues and cycles.
412 completed · 468 issues
Cycle time (p50)
2.8d
p90 7.5d
measuredconfidence 80n=412 · min 20
Issue started → completed (Linear), p50 / p90.
Throughput
14/wk
completed issues / active week
measuredconfidence 85n=412
Completed issues per week (Linear).
Predictability
84%
completed ÷ committed scope
measuredconfidence 70n=6 · min 3
Completed ÷ committed scope per cycle (Linear), median of the last six cycles.
Throughput
Completed issues per week
showing 90 daysPredictability
Committed vs completed scope per cycle
complete cycles| Cycle | Window | Committed | Completed | Delivered |
|---|---|---|---|---|
| #45 | 2026-09-14 → 2026-09-28 | 40 | 36 | 90% |
| #44 | 2026-08-31 → 2026-09-14 | 38 | 33 | 87% |
| #43 | 2026-08-17 → 2026-08-31 | 36 | 30 | 83% |
| #42 | 2026-08-03 → 2026-08-17 | 34 | 27 | 79% |
| #41 | 2026-07-20 → 2026-08-03 | 32 | 25 | 78% |
| #40 | 2026-07-06 → 2026-07-20 | 30 | 22 | 73% |
Honesty
How these are derived
- Cycle time uses issue startedAt → completedAt. Production-deploy correlation isn't available in Linear, so this is the honest available signal, not “work-started → deployed”.
- Throughput counts distinct completed issues per ISO week; the headline rate uses the trailing 12 active weeks.
- Predictability is the median of completed ÷ committed scope across complete cycles only.
- Below the sample minimums a metric shows “insufficient data” rather than a misleading number.